http://www.daytonwa.com/
What is the project?Upgrade sewer collection system for city of Dayton.
When?Within 10 years.
Where is it?Sewer lines will be replaced by end of November on Third Street from School Bus Lane to Jackson along with current street renovation project. Other lines throughout town.
How much does it cost?Not available.
Why is it being proposed?Sewer lines are old and deteriorating. Some have places where there is partial collapse.
What is the project?Streets in Dayton.
When?As funds become available.
Where is it?In rotation, as streets need repair or renovation.
How much does it cost?Depends on the type of street. Arterials are usually rebuilt down to the bed, which is costlier than chip
seal or 2-inch overlays.
Why is it being proposed?Streets are in various stages of deterioration.
What is the project?Replacing equipment in the city of Dayton.
When?As money is available.
What does it cost?Street sweeper, $100,000.
Why is it being proposed?Current machine is wearing out. It is welded regularly to hold it together.