Sign in to wikis by wetpaint
This version of Internet Explorer is no longer supported. Please try a current version of
IE
or
Firefox
.
Home
Discussions
Photos
Videos
News
Updates
Members
Sign in
or
City of College Place
Page Versions
Key:
additions
deletions
Please select two page versions to compare - check the checkbox to the right of each version.
Showing 7 pages
Date/Time
Made By
Edit Note
Type
Scope
Compare
Sep 9 2007, 12:18 PM EDT
unionbulletin
edit
4 words added
Change:
College Place Public Schools
What is the project?City of College Place Meadow Brook water line upgrade.Where is it?Project would create a water main loop around John Sager and Meadow Brook Intermediate schools by installation of about 1,400 feet of 12-inch diameter water line.How much
View changes from previous version.
(Word count: 438)
Sep 6 2007, 11:53 AM EDT
unionbulletin
edit
1 word added
1 widget deleted
Change:
http://ci.college-place.wa.us/
What is the project?City of College Place Meadow Brook water line upgrade.Where is it?Project would create a water main loop around John Sager and Meadow Brook Intermediate schools by installation of about 1,400 feet of 12-inch diameter water line.How much does it cost?About
View changes from previous version.
(Word count: 434)
Sep 5 2007, 1:09 PM EDT
unionbulletin
edit
1 widget added
Change:
There were only format changes (bold, italics, etc.) in this version.
See this version for details.
(Word count: 428)
Sep 5 2007, 11:35 AM EDT
unionbulletin
edit
1 word added
1 word deleted
Change:
$50,000 for vehicle storage building.Why is it being proposed?Records storage building is needed to house documents city is legally required to keep. Vehicle building would provide heated (non-freezing) garage for designated city vehicles as well as protection from elements that would degrade
vehicles.
vehicle.
View changes from previous version.
(Word count: 428)
Sep 5 2007, 11:35 AM EDT
unionbulletin
edit
348 words added
1 word deleted
Change:
$50,000 for vehicle storage building.
Why is it being proposed?
Records storage building is needed to house documents city is legally required to keep. Vehicle building would provide heated (non-freezing) garage for designated city vehicles as well as protection from elements that would degrade vehicles.
View changes from previous version.
(Word count: 428)
Sep 5 2007, 11:09 AM EDT
unionbulletin
edit
69 words added
Change:
Project would create a water main loop around John Sager and Meadow Brook Intermediate schools by installation of about 1,400 feet of 12-inch diameter water line.
How much does it cost?
About $150,000 (2005 estimate).
Why is it being proposed?
Fire safety and to provide
View changes from previous version.
(Word count: 72)
Sep 5 2007, 11:07 AM EDT
unionbulletin
create
No content added or deleted.
Change:
Created by
unionbulletin
Sep 5 2007, 11:07 AM EDT for: no reason given
JavaScript must be enabled in order for you to contribute to this site.
To start contributing, enable JavaScript by changing your browser options, then
try again
.
Home
Union-Bulletin series articles
What the community says
What local agencies say
City of Walla Walla
Walla Walla County
City of Milton-Freewater
City of College Place
COLLEGE PLACE PUBLIC SCHOOLS
City of Dayton
City of Pomeroy
City of Waitsburg
Town of Starbuck
Garfield County
Port of Columbia
City of Prescott
Past Bond Elections
Early Walla Walla
By The Numbers
new page
(Uncategorized)